HOW OUR COOPERATION IS GOING

5 STEPS TO AN ARCHED MODULAR HALL

We offer comprehensive design, manufacturing, and supply services. Our design team will prepare a free study of your hall, and if you are interested, we can provide detailed project documentation tailored to your requirements. We have developed numerous solutions, including construction details, insulation systems, interior ceilings, and gable walls.

We also handle complex projects for sports facilities, including flooring, acoustic solutions, heating, and lighting. We are happy to visit you and help bring your vision to life with our expertise and experience.

The HUPRO self-supporting structure requires minimal maintenance during its exceptionally long service life. After exceeding the standard normative climatic load values, it is necessary to perform maintenance in accordance with regulations.

We Start with What Matters Most to You

1. CONSULTATION AND SOLUTION DESIGN

Our cooperation begins with a thorough consultation during which we identify your needs and project specifications. Based on your requirements, we prepare a free study of the hall, including a construction design, recommendations for technical parameters, and a preliminary cost estimate. This ensures that the project meets your expectations from the very beginning.

untitled 5 2
pexels photo 1109541

From Design to Precise Documentation

2. DETAILED PROJECT PREPARATION

After approving the study, we create detailed project documentation. This includes all aspects of construction, such as structural details, insulation options, ventilation systems, and interior design. We ensure that the project complies with local regulations and is tailored to the climatic conditions of the site.

Quality Begins in the Details

3. MANUFACTURING AND DELIVERY OF PARTS

Our certified manufacturing processes guarantee high durability and long lifespan of structural components. The parts are made from ALUZINC® material and optimized to reduce transportation costs, ensuring an economically advantageous solution.

construction 4754310 1280

Speed and precision are our priority.

4. FAST AND EFFICIENT ASSEMBLY

On-site assembly is carried out quickly and efficiently. Thanks to prefabricated components and our well-thought-out system, we can complete the construction of a 1,000 m² hall within 14 days. The individual structural units are securely anchored using chemical anchors and are resistant to even the most demanding climatic conditions.

Together even after the project is completed.

5. HANDOVER AND POST-IMPLEMENTATION SUPPORT

After the assembly is completed, we will hand over the hall in perfect condition. We provide operation and maintenance manuals, or we can train your team. Our support does not end with the handover – we are available for future service and consultations.

chain 4874044 1280
unnamed 3
sktelc1 min
unnamed
unnamed 4
unnamed 3
unnamed 2